Thanks for your clarification.
I have one more query which is not related to the Project status.
When a Dynamic item is being populated in DMR after DP91 transaction,the summarisation of material or activity takes place and If there are A(50$),B(25$),C(25$) are the materials posted and grouped to form Dynamic Item "Material" and E(100),F(50$),G(50$) are the activity posted and grouped to form Dynamic item "Labor" based on grouping set in material determination,
the DMR will reflect as
Line item 10
Material Material
Price 100$
Line item 20
Material Labor
Price 200$
My client need a report which would give a detailed list of Dynamic item along with quantity and value by just entering the Billing document number.
Like
Material
A 50$
B 25$
C 25$
Labor
A 100$
B 50$
C 50$
What are the tables I need to refer to bring up a report as stated above.
I couldnt get these details in AD01DLI and AD01DLIEF
Regards
Vignesh R