Quantcast
Channel: SCN: Message List
Viewing all articles
Browse latest Browse all 8623

Re: TECO Status in WBS ELement not allowing DP91 transaction for RRB

$
0
0

Thanks for your clarification.

 

I have one more query which is not related to the Project status.

 

When a Dynamic item is being populated in DMR after DP91 transaction,the summarisation of material or activity takes place and If there are A(50$),B(25$),C(25$) are the materials posted and grouped to form Dynamic Item "Material" and E(100),F(50$),G(50$) are the activity posted and grouped to form Dynamic item "Labor" based on grouping set in material determination,

the DMR will reflect as

Line               item 10

Material         Material

Price             100$

 

Line                item 20

Material          Labor

Price              200$


My client need a report which would give a detailed list of Dynamic item along with quantity and value by just entering the Billing document number.


Like


Material


A   50$

B   25$

C   25$


Labor


A  100$

B  50$

C  50$


What are the tables I need to refer to bring up a report as stated above.

I couldnt get these details in AD01DLI and AD01DLIEF


Regards

Vignesh R


Viewing all articles
Browse latest Browse all 8623

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>