Looks like a strange thing for me but shouldn't be for you experts out there.
A planned order, indeed a 'Run Schedule Quantity' was created. When going through the components list could see the components well available.
A Reservation number was also generated against the given planned order, could see the same from table 'RESB'. But upon reviewing the list of components in their respective MD04 list couldn't find any dependent requirement's generated there.
One such example (the material marked in the previous screen shot) is as follows: It's just the same for all the components.
One of my colleague went saying that: These planned orders were created with Rough Cut Planning. So, the MRP needs to be re-run for these materials with Planning Mode 3. So Is there any logic in this ?
Note: These components are not set with Bulk material indicator either in the material or in the Item at the BOM level.
Please do help me out.
Regards,
Rahul