Quantcast
Channel: SCN: Message List
Viewing all articles
Browse latest Browse all 8623

Re: To exclude MR21 price differences from Material Ledger Actual costing

$
0
0

Hi Choi.

I recomend you think in this value in other way, just multiply the units * (actual cost - new standard)

48235 = 951 ( 300.72 - 250)

 

This is the value that roll up, exactly like other price difference because is needed in order to calculate the actual cost in month 08.

 

If you see the whole post (MR21 + CKMI) you can see the net value of BSX is the PRY value, i mean

 

bsx-MR21 + bsx-ckmi = pry = The price differenec between the actual and the new standard.

UMB-mr21 + umb-ckmi = 0

 

I think that UMB dont have relation with PRY, i mean is not part nor have a hiden value inside. UMB is just a temporary post, sort of  trick that SAP create in order to comunicate previos and next month, but dont have relation with the PRY post.

ScreenHunter_64 Aug. 13 22.07.jpg

the 50 is rounding difference, but this is other history....maybe topic of other blog...

 

You see in the end stock the "single level price determination, and dont have "inside" part of the UMB posted, nor create $ from nowhere.

 

 

 

Arturo.


Viewing all articles
Browse latest Browse all 8623

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>