Hi all,
I have a requirement to update the means of transport which gets assigned in the SNC PO replicated from ECC.
The basic requirement is to influence the logic for calculation of the SHIPDATE.Since MEANS OF TRANSPORT is used to calculate the SHIP DATE,we want to change it as per our custom requirement which in turn will calculate the SHIP DATE as we need.
I couldnt find any badi or user exit in the system which will alow me to do that...Any sugegstions how the above cna e achieved?
The BADI I found was /SCA/SCHEDULE however this has the means of transport as the IMPORTING PARAMETER.
Please help.